天通水處理設(shè)備廢水污水處理設(shè)備工程案例 |
![]() |
價格: 元(人民幣) | 產(chǎn)地:山東濟寧 |
最少起訂量:1臺 | 發(fā)貨地:山東濟寧 | |
上架時間:2017-12-09 15:27:57 | 瀏覽量:134 | |
濟寧市天通機械設(shè)備有限公司
![]() |
||
經(jīng)營模式:生產(chǎn)加工 | 公司類型:私營有限責(zé)任公司 | |
所屬行業(yè):筑養(yǎng)路機械 | 主要客戶:路面工程 | |
![]() ![]() |
聯(lián)系人:范樂 (先生) | 手機:18953768880 |
電話: |
傳真: |
郵箱:1727666796@qq.com | 地址:濟寧市任城區(qū)唐口工業(yè)園 |
濟寧天通設(shè)備有限公司是一家從事水處理設(shè)備生產(chǎn)、銷售集一體化的企業(yè),經(jīng)過不斷的努力在國內(nèi)外獲得了供不應(yīng)求的大好市場,贏得了客戶的一致好評。多年的發(fā)展歷程,公司始終堅持創(chuàng)新、品質(zhì)、服務(wù)、敬業(yè)、感恩的理念。采納新創(chuàng)意,嚴(yán)格質(zhì)量,全方位的服務(wù)跟蹤,堅持做出高品質(zhì)產(chǎn)品。我公司主要產(chǎn)品:水處理設(shè)備,污水處理設(shè)備、廢水處理設(shè)備、工業(yè)污水設(shè)備、農(nóng)業(yè)廢水設(shè)備、雨水凈水設(shè)備、醫(yī)院污水設(shè)備、鋼廠廢水設(shè)備、屠宰場廢水設(shè)備、食品廠廢水處理設(shè)備等多種設(shè)備,可根據(jù)要求專業(yè)定制水處理設(shè)備。 水處理的方式包括物理處理和化學(xué)處理。人類進行水處理的方式已經(jīng)有相當(dāng)多年歷史,物理方法包括利用各種孔徑大小不同的濾材,利用吸附或阻隔方式,將水中的雜質(zhì)排除在外,吸附方式中較重要者為以活性炭進行吸附,阻隔方法則是將水通過濾材,讓體積較大的雜質(zhì)無法通過,進而獲得較為干凈的水。另外,物理方法也包括沉淀法,就是讓比重較小的雜質(zhì)浮于水面撈出,或是比重較大的雜質(zhì)沉淀于下,進而取得。化學(xué)方法則是利用各種化學(xué)藥品將水中雜質(zhì)轉(zhuǎn)化為對人體傷害較小的物質(zhì),或是將雜質(zhì)集中,歷史最久的化學(xué)處理方法應(yīng)該可以算是用明礬加入水中,水中雜質(zhì)集合后,體積變大,便可用過濾法,將雜質(zhì)去除。
市政污水處理工程案例(缺氧+傳統(tǒng)活性污泥法) 某污水處理廠是大連市修建的一座大型污水處理廠。該廠的建設(shè)引進關(guān)鍵技術(shù)、監(jiān)控裝置和設(shè)備,提高污水處理效率,充分利用生物能,節(jié)約能耗,節(jié)省用地,降低工程造價和運行成本。 該污水處理廠的工藝設(shè)計,在進行各種工藝方案比較的基礎(chǔ)上,仍選用鼓風(fēng)曝氣的設(shè)計方案。其理由是大型污水處理廠采用鼓風(fēng)曝氣工藝管理簡便、運行可靠。該污水處理廠肖化吸收了國外的先進技術(shù),對每個單項構(gòu)筑物及污水、污泥處理的細(xì)部方案都作了改進,如進水泵房及污水量計量的自動控制、洗砂排砂、排泥濃度控制、溶解氧白控、脫氨反硝化工藝、二沉池出水槽新工藝、消化池投泥方式、大型消化池的沼氣攪拌、沼氣發(fā)電升壓聯(lián)網(wǎng)、沼氣鍋爐及排泥閥、可調(diào)堰、細(xì)格柵等先進技術(shù)都在該廠得到了應(yīng)用。
該廠污水處理系統(tǒng)分4個系列,4個圓形初沉池排成一行,4個曝氣池組成田字形,8座二沉池設(shè)在廠區(qū)南側(cè),臨近北塘排水河,使處理出水可就近排人河道。污泥處理區(qū)設(shè)在廠的西北角,5個消化池組成梅花形,污泥處理的控制室設(shè)在5個捎化池的中央。北側(cè)設(shè)有兩個沼氣儲罐、污泥脫水機房和沼氣發(fā)電機房等。
主要處理構(gòu)筑物及設(shè)備參數(shù): 1.進水格柵 格柵是污水處理廠的第一道預(yù)處理設(shè)施。該廠設(shè)6臺垂直格柵,由計算機程序控制。高水位時格柵清污機將連續(xù)工作,運送格柵攔截的浮渣的皮帶運輸機與格柵清污機聯(lián)鎖運行,在所有格柵停止工作后,皮帶運輸機仍將繼續(xù)運行一段時間。 6臺垂直格柵每臺寬2m,柵條凈距25 mm。 2.進水泵房 設(shè)6臺HLWB-10型立式渦殼混流泵,5用1備。 水泵參數(shù):流量1.32立方/秒,揚程13.2m,電機動率260kw。 泵房設(shè)有6個控制水位,控制5臺泵的運行。為避免個別水泵負(fù)荷偏重而反復(fù)起動,水泵將依次循環(huán)投人運行。當(dāng)某臺泵因故障停止工作時,另一臺泵將自動投入運行。 3.曲面格柵 8臺曲面格柵設(shè)在沉砂池的端部。每臺格柵寬度1.2m,柵條曲率半徑2.0 m,柵條凈距10m。 每臺格柵的清污動作根據(jù)水位模擬信號由計算機控制。當(dāng)水位差處于正常值時,清污工作將按設(shè)定時間動作;當(dāng)前后水位差超過設(shè)定值時,清污工作將連續(xù)進行。如果清污工作連續(xù)操作時間過長,計算機將發(fā)出報警信號。 曲面格柵刮出的浮渣落在皮帶運輸機上,皮帶運輸機的運行與格柵清污機聯(lián)鎖,清污工作停止后,運輸機仍將運行一段時間。 4.沉砂池 曝氣沉砂池設(shè)有6條廊道,每條長30m、寬4m、深4.3m,水力停留時間約6min。 池內(nèi)設(shè)有振動空氣(VIBRAIR)曝氣器648個,供氣量為5184立方米/小時。全池設(shè)兩座吸砂工作橋,每個工作橋上有3個空氣提砂裝置,負(fù)責(zé)3條廊道的吸砂。污穢的砂水被提升到洗砂槽,經(jīng)攪拌后,有機物隨洗砂水流回進水泵房,砂水被送至分砂機進行進一步脫水。分砂機設(shè)在進水泵房的上部建筑頂層,以便脫水的砂粒流入砂斗運走。 吸砂工作橋用行程開關(guān)控制,其上設(shè)有刮渣設(shè)施,以清除池內(nèi)浮渣。空氣提砂裝置要求注續(xù)工作,由計算機控制。當(dāng)空氣壓縮機發(fā)生故障時,備用機可自動投入。空氣壓縮機、分砂機和泵的運行狀態(tài)由計算機監(jiān)控,如出現(xiàn)故障將自動報警。 5.初沉池 初沉池曾設(shè)計了矩形和圓形兩種方案,從運行管理、占地和混凝土用量等方面進行比較,認(rèn)為圓形輻流式沉淀池設(shè)備運轉(zhuǎn)可靠、管理簡便,故采用了4座配有周邊驅(qū)動全橋式刮混機的輻流式沉淀池,直徑達(dá)60m,水深4.5 m,沉淀時間2.26h。 初沉池運行的關(guān)鍵是排泥,4座池輪流排泥的程序由計算機控制。每個排泥閥靠頻率/時間自動操作。其功率/時間將根據(jù)計算機監(jiān)測到的污泥濃度和流量束進行調(diào)整。排泥閥分兩部分,啟用的是電動閥門,排泥口用的是可手動調(diào)節(jié)的升降閥,該閥屬非標(biāo)設(shè)備。 6.初沉污泥泵房 為防止排泥系統(tǒng)出現(xiàn)堵塞故障,在兩座初沉池間設(shè)一座污泥泵房。安裝GF單螺桿泵4臺,兩座泵房共裝8臺污泥泵。污泥泵按頻率鄺j問自動操作,并由計算機進行調(diào)整,兩座污泥泵房交替運行,在泵房的出口處設(shè)有污泥濃度模擬測量裝置,污泥進人濃縮池前進行 流量檢測。這些信號進入計算機后,將用于計算污泥的排放量,以調(diào)整排泥技術(shù)上頻率和排混的持續(xù)時間。 Jining day general equipment co., LTD. Is a company engaged in water treatment equipment production, sales integration enterprise, after continuous efforts won the demand of the market both at home and abroad, won the customer consistent high praise. Over the years, the company has always adhered to the concept of innovation, quality, service, dedication and gratitude. Adopt new ideas, strict quality, all-round service tracking, insist on making high-quality products. My company main products: water treatment equipment, sewage treatment equipment, wastewater treatment, industrial wastewater, agricultural wastewater, rain water purification equipment, hospital sewage equipment, steel plant waste water equipment, slaughterhouse wastewater treatment equipment, food factory waste water treatment equipment and other equipment, can professional custom according to the water treatment equipment. The way water is treated includes physical processing and chemical treatment. The ways in which human water treatment have been years of history, physical methods including the use of a variety of different aperture size, the filter material using adsorption or blocking way, exclude the impurities in the water, the adsorption mode of less important for adsorption on activated carbon, blocking method is through the water, the filter material for large impurity cannot pass, and get more clean water. In addition, the physical method also includes precipitation method, which is to make the impurity of the smaller proportion floating in the water, or the impurities of the larger proportion are deposited in the lower, and thus obtained. Chemical method is to use various chemicals to the water impurities into smaller material harm to the human body, or the impurity concentration, the oldest of the chemical treatment method should be use alum in the water, the water impurities after collection, volume change, used to filter method, remove the impurities. Municipal sewage treatment works (hypoxia + traditional activated sludge method) A sewage treatment plant is a large sewage treatment plant built in dalian. The construction of the plant introduces key technologies, monitoring devices and equipment to improve the efficiency of sewage treatment, make full use of the energy of biomass, save energy, save land, reduce project cost and operation cost. The process design of the wastewater treatment plant is based on the comparison of various process schemes, and the design scheme of air blast aeration is still selected. The reason is that the large sewage treatment plant is simple and reliable. The sewage treatment plant XiaoHua absorbed foreign advanced technology, for each single structure and detailed scheme of sewage and sludge treatment were improved, such as feed water pump house and the automatic control of sewage quantity measurement, washing sand sand, mud concentration control, white accused of dissolved oxygen, ammonia denitrification technology, new technology of the second pond, the water tank, the digester throw mud way, large biogas digester of stirring, biogas power generation booster networking, biogas boiler and mud valve, adjustable weir, fine grille and other advanced technology have been applied in the factory. Four series are the factory sewage treatment system, four round pond, line, at the beginning of four aeration ChiZu narita glyph, eight the second pond is located in the south area of the plant near the north river, pond drainage treatment, water can row to the nearest river. The sludge treatment area is located in the northwest corner of the factory, and the five digesters form the plum blossom shape, and the control room of sludge treatment is in the center of 5. There are two biogas storage tanks, sludge dewatering machine room and biogas generator room. Main structure and equipment parameters: 1. Inlet grille Grille is the first pre-treatment facility for sewage treatment plants. The factory has 6 vertical grille, controlled by computer program. High water level grille decontamination machine will work continuously, carrying grille intercept the scum of the belt conveyor with interlocking operation grille decontamination machine, after all the grille to stop working, belt conveyor will continue to run for a period of time. 6 vertical grille for each width of 2m, grid strip distance of 25 mm. 2. Inlet pump room Set up 6 hlwb-10 vertical turboshell mixed pump, 5 with 1 backup. Water pump parameters: 1.32m3 / second, lift 13.2 m, electric mobility rate 260kw. The pump room has 6 control water level, control the operation of 5 pumps. In order to avoid the repeated starting of individual pump load, the water pump will be circulated in turn. When a pump fails to work, another pump will be automatically put into operation. 3. Curved grille The 8 curved grille is located at the end of the sink. The width of each grille is 1.2 m, the curvature radius of the grating is 2.0m and the grid bar is 10m. The cleaning action of each grille is controlled by computer according to the water level simulation signal. When the water level is at the normal value, the cleaning work will be determined by the setting time; When the current water level difference exceeds the set value, the cleaning work will be carried out continuously. If the clean-up operation is too long, the computer will send an alarm signal. The scum of the curved grille falls onto the belt conveyor, the belt conveyor runs with the grille cleaning machine interlock, the transport plane will still run for some time after the decontamination work stops. 4. The grit chamber There are 6 corridors in the aeration and settling pit, with each length 30m, 4m wide and 4.3m deep, and the water retention time is about 6min. The tank has a VIBRAIR aerator of 648 and air supply of 5,184 cubic meters per hour. There are two sand suction work Bridges in the whole pool, and each work bridge has three air lift equipment, which is responsible for the sand absorption of three corridors. The polluted sand water is hoisted to the washing trough. After stirring, the organic matter comes back into the inlet pump room with the washing water, and the sand water is sent to the sander for further dehydration. The sand control machine is located at the top of the upper building of the inlet pump room so that the sand can be transported by the sand. The sand suction work bridge is controlled by the travel switch, which has the slag removal facilities to remove the dregs in the tank. The air lifting device requires the injection of continuous work, controlled by computer. When the air compressor fails, the standby machine can automatically input. The operation state of air compressor, sand separating machine and pump is monitored by computer. 5. At the beginning of pond, Pond, once at the beginning of design for rectangular and circular two kinds of schemes, from aspects of the operation and management, covering and concrete consumption comparison, think circular radial flow sedimentation tank equipment and reliable operation, easy management, so the four with peripheral driving bridge type mixed scraper radial sedimentation basin, 60 m in diameter and depth of 4.5 m, precipitation time 2.26 h. The key to the initial sink operation is the sludge discharge, and the four pools rotate the mud in turn by computer control. Each dredge valve operates automatically by frequency/time. The power/time will be adjusted according to the concentration of sludge and the flux of the monitor. The dredge valve is divided into two parts, and the electric valve is enabled. The discharge valve is a manual adjustable lift valve, which is a non-standard equipment. 6. Sludge pump room A sludge pump room was established between two initial sinks to prevent the sludge system from being blocked. Installation GF single screw pump 4, two pump room with 8 sludge pump. Sludge pump according to the frequency of kuang j q automatic operation, and adjusted by a computer, two sludge pump room, alternately in the pump room is equipped with the sludge concentration at the exit to simulate measurement device, sludge thickener in before Flow detection. These signals will then be used to calculate the amount of sludge emitted by the computer to adjust the duration of the frequency and mixing of the sludge. |
版權(quán)聲明:以上所展示的信息由會員自行提供,內(nèi)容的真實性、準(zhǔn)確性和合法性由發(fā)布會員負(fù)責(zé)。機電之家對此不承擔(dān)任何責(zé)任。 友情提醒:為規(guī)避購買風(fēng)險,建議您在購買相關(guān)產(chǎn)品前務(wù)必確認(rèn)供應(yīng)商資質(zhì)及產(chǎn)品質(zhì)量。 |
機電之家網(wǎng) - 機電行業(yè)權(quán)威網(wǎng)絡(luò)宣傳媒體
關(guān)于我們 | 聯(lián)系我們 | 廣告合作 | 付款方式 | 使用幫助 | 會員助手 | 免費鏈接Copyright 2011 jdzj.com All Rights Reserved技術(shù)支持:杭州濱興科技有限公司
銷售熱線:0571-28292387 在線客服:0571-87774297
展會合作/友情連接:0571-87774298
網(wǎng)站服務(wù)咨詢:0571-28292385
投訴熱線:400-6680-889(分機7)
網(wǎng)站經(jīng)營許可證:浙B2-20080178